Lesson 3 of 8 · All lessons in this module
  1. Types of capital investments
  2. The capital allocation process and NPVVideo lesson
  3. IRR, and choosing between IRR and NPVVideo lesson
  4. Return on invested capital (ROIC)Video lesson
  5. Integrated case: three projects against a ROIC target
  6. Principles of capital allocation
  7. Capital allocation pitfalls
  8. Real optionsVideo lesson

Lesson 3 of 8 · 13 min

IRR, and choosing between IRR and NPV

The IRR is the discount rate that makes NPV zero; it is a handy percentage, but when it conflicts with NPV, NPV wins.

In short

  • The internal rate of return (IRR) is the discount rate at which NPV = 0.
  • Rule: invest if IRR ≥ r, the required return, which is why r is called the hurdle rate.
  • IRR equals the investor's actual return only if interim cash flows are reinvested at the IRR; NPV assumes reinvestment at r, usually more realistic.
  • If the cash flow signs change more than once, a project can have multiple IRRs; use NPV instead.
  • For mutually exclusive projects, choose the higher NPV, because IRR ignores the size and duration of the project.

Unlock this lesson free for 7 days

Create a free account to get 7 days free: every lesson, video and flashcard, and the question bank. No card needed.